The aim was to lay the conveyor belt for a smooth runway and if time permitted to roll out the pits area also.
The belt was rolled out, the ends were then buried in a shallow trench, thanks to Aaron and his neat digger.
The guys are hard at work preparing the east end for burial.
David C neatened the ends after it was thouroughly pinned down.
The smooth runway area is 9 metres by 55 metres as I paced it out.
The executive area of the pits was next for the treatment.